IQ INSTALLATION GUIDE
• Above-the-deck installation: The IQ System is designed to be installed while standing on the deck. This makes installation much faster and easier than “below-the-deck" hidden fasteners.
• Just Clip & Flip™: Simply align the clips with the joists, attach to the bottom of each board using one 7/8" screw in the center hole of each clip. Flip. Then install the joist screw. In three easy steps, you’re done.
• One clip: The IQ System is engineered with one style clip. No special Right Clip, Left Clip, Butt Joint Clip. One clip does it all.
• One tool: The only tool you will need to install the IQ system is a drill. No need for a sledge hammer, a biscuit cutter or a bow wrench.
• Butt joints: Use the same IQ Clip. Align board ends, gapping between where necessary. Center clip over the seam and install two 7/8" screws in outside clip holes. Note: Hardwoods require predrilling at butt joints.