Hero2

ICON Screw Joist

Product Details

Hero3
B Ball Install4
B Ball Install7
Focused Blocker1
IMG 4270

ICON com­bines the strength of steel with the work­a­bil­i­ty of wood to cre­ate the ulti­mate deck structure.

Speed of Installation:Projects are often reduced by 1 – 2 days
Light­weight:Half the weight of stan­dard PT joists
Flat­ter Surface:Deck sur­face is flat for eas­i­er instal­la­tion and a bet­ter final product
No Joist Hang­ers and Ties:No addi­tion­al hard­ware is need­ed to attach the screwjoists
Wider Joists:Near­ly dou­ble the sur­face area makes the struc­ture safer dur­ing construction
Code-Com­pli­ant:Ful­ly test­ed and engi­neered to meet load requirements

Building your FastenMaster ICON ScrewJoist Deck Substructure

1

Submit your deck plan to your FastenMaster ICON Field Sales Rep.

2

FastenMaster ICON Tech team will create a code-compliant engineered drawing.

3

Once you approve the drawing, FastenMaster will manufacture the specific ScrewJoist quantities and lengths required.

4

Your ICON ScrewJoist substructure will be delivered to your jobsite.

5

Set your ledger and carrying beam correctly for an ICON system.

6

Follow the instructions on you ICON plan to install the joists.

Request an ICON Job!

Submit your plans to receive an ICON deck quote